Recent Updates Page 43 Toggle Comment Threads | Keyboard Shortcuts

  • Unknown's avatar

    Thom Hines 6:29 pm on April 21, 2011 Permalink | Reply  

    Tinker Presentation 

    Google Presentation: https://docs.google.com/present/embed?id=dftbjs8g_274g7xg73cr&size=m

    Also, for anybody who is following along with Tinker, you can grab the latest release here. To upgrade, all you have do to is overwrite the ‘core’ folder with the one that’s included in the zip file. All your settings and user info will remain.

    Stay tuned for further updates. By next week I’ll have auto-save drafts and versions!

     
  • Unknown's avatar

    hilalkoyuncu 5:03 pm on April 21, 2011 Permalink | Reply  

    Presentation-Hilal 

    hilalkoyuncu.com/computation_final_first presentation.ppt

    This is a video of the insides when they were fully functional.

    hilalkoyuncu.com/IMG_3092.MOV

     
  • Unknown's avatar

    catherine 4:30 pm on April 21, 2011 Permalink | Reply  

    kickstarter article in the NYTimes today 

    kickstarter article

     
  • Unknown's avatar

    catherine 4:03 am on April 21, 2011 Permalink | Reply  

    kni++ kick! 

    oh yeah!!! $5000 here I come!!! A++ not C++, for once! ^___^
    http://www.kickstarter.com/projects/291202879/kni-scarves-that-illuminate

     
  • Unknown's avatar

    lpercifield 11:46 pm on April 20, 2011 Permalink | Reply
    Tags:   

    Flush-O-Meter prototypes 

    So I’m making progress on sensor unit and the end device. I’ve slowed the development of the sensor to make sure that it will be working properly and stay working when I finally get it installed. I’ve been working on power management of the arduino and cell phone. I’ve been using some nice code that I found to put my arduino to sleep. Here are two places to look for this.

    http://donalmorrissey.blogspot.com/2010/04/putting-arduino-diecimila-to-sleep-part.html

    http://interface.khm.de/index.php/lab/experiments/sleep_watchdog_battery/

    I cut the first version of the breadboard for the sensor and will have it soldered up for monday.

    I also have the pelican case that I’m going to use:

    As for the end device, I’ve decided to make a change on how its going to look and work. In thinking about the look and feel of the device I noticed that there was no really good place to install a light in my bathroom. I also noticed that there are light fixtures over my sink that have exposed lightbulbs. I then came up with the idea to create a internet connected lightbulb. The lightbulb can replace any normal bulb in any fixture. This allows people to use their existing light fixtures and removes the need for an addition device in the house. The nature of the design that I came up with also allows for the bulb adapter to be removed and for the device to be plugged directly into a electrical socket.

    I ordered all the parts need to build a prototype this weekend.

     
  • Unknown's avatar

    thisisvictorkim 6:11 am on April 20, 2011 Permalink | Reply  

    Kickstarter is easy 

    http://www.kickstarter.com/projects/1156128870/video-appropriation-working-title

     
    • Lee's avatar

      Lee 2:33 pm on April 20, 2011 Permalink | Reply

      Not true, my kickstarter was rejected =(

  • Unknown's avatar

    thisisvictorkim 10:55 pm on April 19, 2011 Permalink | Reply  

    schedule 

    something must’ve happened, I definitely posted a full schedule before class on Monday…

    for May  09 – Final Presentation.  Do a little dance, make a little love, get down tonight… get down tonight.

    for May  05 – finish rough draft, fine tune videos/sound, rehearse,

    for May  02 – user testing, fill in a bit of final paper sections, fine tune videos/sound, rehearse

    for April 28 – user testing, plan out final paper sections, collect more videos, master sound and fine tune timing, rehearse

    for April 25 – User testing, get Kickstarter page up with updated demo video, come up with theme for video samples, start collecting videos, plan out “storyline”/song structure of the performance

    for April 21 – plan out short presentation, work out pad kinks, add playback speed and step sequencer functionality

    for April 18 –

     
  • Unknown's avatar

    Oylum 12:18 am on April 19, 2011 Permalink | Reply  

    Sewing, sewing… 

    I decided to work on the look and feel and started making my robot plush toy. However, without a sewing machine, it took me forever to sew it. It still does not have eyes or any signs on live on it, but it’s getting there.

    (More …)

     
  • Unknown's avatar

    Chris Piuggi 11:10 pm on April 18, 2011 Permalink | Reply  

    Schedule 

    So much going on here  – plants are growing, fish are going…
    Can’t wait to update you all on Thursday.

    Below is my schedule for the rest of the semester :

    4/18 Implement Filter prototype 1 /Testing / Sensor Prototypes

    4/21 Begin Building prototype 2/ Begin Sensor Network

    4/25 Implement Filter prototype 2/ All Data to Network

    4/28 Paper Writing/ Eating/ Testing

    5/2 Paper Writing/ Eating/ Testing

    5/5 Paper Writing/ Eating/ Testing

    5/9 Presentation

     
  • Unknown's avatar

    hilalkoyuncu 9:47 pm on April 18, 2011 Permalink | Reply  

    New Prototype, new character… 

    He doesn’t have a name yet but my new toy is heart broken. You keep him company, listen to music with him, talk to him,
    dance with him, hug him… help him mend his broken heart.

    I have been building him since saturday, non stop. I still couldn’t close him up yet but I made huge progress.

    My code is in place as well but, I will most likely modify it based on user testing which I was supposed to start today but unfortunately I need one mpre day to fully establish my enclosure.

    Here are many many pics and videos of my new prototype:

    (More …)

     
  • Unknown's avatar

    Alvaro Soto 7:25 pm on April 18, 2011 Permalink | Reply  

    Modulo Schedule 

    Color Test and Logo

    Quick Rendering of the final product

    Schedule

    Monday 04/18 : Prototype different connections (Copper tape, Pins, and furniture connectors)

    Tuesday 04/19: cut color disks/write for paper

    Wednesday 04/20: Start building

    Thursday 04/21: building, presentation

    Friday 05/22: Building

    Saturday 06/23: building

    Sunday 04/24: Building/ finish and paint

    Monday 05/26: bring disks to class and select the best ones

     
  • Unknown's avatar

    lpercifield 4:56 pm on April 18, 2011 Permalink | Reply
    Tags:   

    DEP Green infrastructure meeting 

    The DEP held a “Green infrastructure” meeting last thursday, which I attended. The concept of the green infrastructure program is to find ways to reduce CSO outfalls by developing alternates to traditional infrastructure. These green initiatives include green roofs, bioswales, and enhanced tree pits to help reduce storm water run-off. There is even a grant program for people to develop these ideas with funding from the DEP, unfortunately the applications are due on the 29th of april. I spoke with several people about my project and got some ideas about how to proceed.

     
  • Unknown's avatar

    Lee 2:53 pm on April 18, 2011 Permalink | Reply  

    OmNom Schedule etc. 

    I found this great precedence for my project!


    The build is going well I now have a rough prototype to understand the sort of size of container I’ll need. I’ve sent in my proposal to kickstarter and am waiting for approval. I have 1 completed personality of noises that are now triggered by the sensors. My next steps are to finish up the multiple personalities, install OmNom and start ding some testing, design a more finished container to be laser cut, and test, test, test.

    April 18
    Have all sensors installed and triggering reactions based on the kinds of interactions I’m expecting.

    April 21
    Have 1 more peronality crafted and a switch to allow the user to change personalities. Install the rough prototype in a waste bin. Have an illustrator file ready for the laser cutter.

    April 25
    Have done some initial user testing and begin to refine interactions, sounds, and code. Have all Personalities crafted and ready for tweaking. Hopefully have materials cut and read to be assembled for final housing.

    April 28
    Installed OmNom in new housing and have a OmNom bin setup on the 10th floor for mass user testing.

    May 2
    More improvements made and 2nd OmNom built and ready for deployment. Rough draft of paper finished. Start collecting all materials for final presentation.

    May 5
    Paper written and finished. Hopefully have raised gobs of money on kickstarter. Any final minor tweaks made. Presentation 90% finished.

    May 9
    Final presentation! and then drinks!

     
    • Behnaz Babazadeh's avatar

      Behnaz Babazadeh 4:12 am on April 24, 2011 Permalink | Reply

      More precedence!
      Here is a project by a previous MFADT student and garbage cans-but not as awesome as omnom 🙂

  • Unknown's avatar

    Thom Hines 11:14 pm on April 14, 2011 Permalink | Reply  

    CMS with a Brand New Name: Tinker? 

    I’ve been wracking my brain about coming up with a name that epitomizes what this CMS is and what it does, and it seems like every synonym to the word simple or easy or clear has been taken. In my mind, much like Yury said the other day in class, people shouldn’t think about managing anything, but rather, that when they see their site, editing isn’t an extra step. If they are logged in, the changes they want to make are available right then, not on some other admin screen. And the fact that this will be built primarily for static or semi-static sites indicates to me that most changes will be only quick edits and simple updates. Lastly, the interface is fun and unique, and working in the system seems almost whimsical in its simplicity. Thus, I (for now) have decided on Tinker. I’d love to hear your feedback.

    On the technical end, I’ve built in a lot of the auto-install process for Tinker, and so it is ready for some early alpha-phase testing. If you want to check it out on a site of your own, you can download the files and upload them to your server. The process for getting it running is pretty simple:

    1) upload the Tinker folder to your public_html (or otherwise web-facing) on your web server

    2) Add the line:
    <?php include(“tinker/core/init.php”) ?>

    to the bottom of your HTML’s <head> section

    3) Navigate to the tinker folder in your web browser and go through the setup process.

    IT’S EASY. Also, try out the image uploader, which you can find in the image button in the toolbar. You will have to set your images folder on the admin page to make this work.

    And finally, here’s my schedule:

    Today April 14
    Ensure file structure is robust (can move around without breaking)
    Make first alpha version available

    Monday 4/18
    Develop more finely-tuned Look and Feel prototypes
    Alter login and server management for more secure account management
    Thursday 4/21
    Establish way of saving drafts of in-progress editing
    Start observed user testing
    Monday 4/25
    Create versioning system
    Apply final styles of Look and Feel
    Post project to KickStarter

    Thursday 4/28
    Rough draft of paper complete
    Release beta version
    Install CMS on my mom’s site
    Start to develop demo/distribution site

    Monday 5/2
    More user feedback on latest version
    Make further progress on demo site

    Thursday 5/5
    Final paper complete
    Launch demo site
    Release final beta

    Monday 5/9
    Final presentation

     
  • Unknown's avatar

    catherine 10:28 pm on April 14, 2011 Permalink | Reply  

    kni++ timeline 

    Monday 4/18
    Make yarn sensors that make sound when stretched.

    Thursday 4/21
    Attach knitting needles to arduino & have them make sound when they touch each other.

    Monday 4/25
    Have the look & feel and implementation finalized.
    Have sounds that I like

    Thursday 4/28
    Work on rough draft of paper. User test.

    Monday 5/2
    Edit based on results of user testing.

    Thursday 5/5
    Final user test.
    Rough draft of paper

    Monday 5/9
    Have demo of experience/presentation set-up & ready for you!

    Monday 5/13
    Finish paper

     
  • Unknown's avatar

    lpercifield 10:27 pm on April 14, 2011 Permalink | Reply
    Tags:   

    Oh crap… Updates 

    So Monday night after class, I trekked out into the rain… When I arrived at NCB-013 there was no sign that it was overflowing. The smell of sewage was in the air though as the rain stirred things up. After getting some photos of the river and holding pond, I heard a loud creaking sound. It was clear that the flood gates were opening. Moments later there was a torrent of water being released into Wallabout bay. The sound of the water rushing from the flood gates was quite incredible…

    Here is the floating boom before the outfall, notice the “floatables”

    Here is the holding pond…

    Here is what the outfall looks like after it gained some steam

     
  • Unknown's avatar

    Yury Gitman 10:19 pm on April 14, 2011 Permalink | Reply  

    Presentation format 

    Your Name
    Title of project
    One Representative Image
    One sentence thesis
    One paragraph thesis
    3-6 images of changing prototypes (with and without users).
    1-2 paragraphs explaining evolution and why
    2 sentences, “Where you are now.”
    3-4 sentences “Where would like to be.”

     
  • Unknown's avatar

    lpercifield 10:01 pm on April 14, 2011 Permalink | Reply
    Tags:   

    Schedule 

    Monday 4/18
    Have the sensor module prototype ready for possible installation
    
    Thursday 4/21
    Have a physical look and feel prototype ready for the personal in home unit
    
    Monday 4/25
    Have the pysical system running for user testing. 
    If sensor is not installed work out test data for the system.
    Possible presentation at the Beacon institute this evening??
    
    Thursday 4/28
    Work on the Web site to display the data and connect users to api
    Rough working draft of paper (Compile prior art and resources
    
    Monday 5/2
    Compile data about sewer shed area and create maps
    
    Thursday 5/5
    Final user testing of the prototypes and web services
    Rough draft of paper
    
    Monday 5/9
    Have a demo of the final system running with pysical and web interaction
    
    Monday 5/13
    Finish PAPER!!
     
    • scottpeterman's avatar

      scottpeterman 10:17 pm on April 14, 2011 Permalink | Reply

      Or…
      4/26 jail
      5/3 a flash flood and you die…

      my money’s actually on an exploding spray paint can first semester of next year doing you in.

      Seriously, sounds/looks like it’s going good! Get those photos up here, they’re great and a really visual illustration of why this data is relevant and needs to be collected.

    • andywallace's avatar

      andywallace 10:19 pm on April 14, 2011 Permalink | Reply

      What kind of suer testing are you planning on since this is an autonomous device? Will you just see how people react to the website or are you still going ahead with the little candles that people keep in their apartments that tells them when to flush?

c
Compose new post
j
Next post/Next comment
k
Previous post/Previous comment
r
Reply
e
Edit
o
Show/Hide comments
t
Go to top
l
Go to login
h
Show/Hide help
shift + esc
Cancel